Project Name: SG4 Pipe Rehabilitation
The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City is proposing system improvements for small diameter sewers situated in the Nancy Creek, Proctor Creek, and Peachtree Creek Sewer Basins.
This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work is July 1, 2025.
The scope of the project includes
- Pre-cleaning of sewers
- Lining of sewers using Cured-in-Place pipe (CIPP)liner
- Replacement of sewers through pipe bursting
- Replacing sewers using open cut methods
- Addressing defects in short pipe sections using internal and external point repairs
- Rehabilitating manholes
Justification:
- Addresses Consent Decree requirements
- Enhances flow capacity of small diameter sewers
- Reduces inflow and infiltration or extraneous flows into the sewer system
- Increases protection of our receiving waters and reduced threat to public health and safety
Project Type: Consent Decree
Proposed Project Start: 02/01/2018
Proposed Construction Start: 05/2020
Scheduled Completion: 12/5/2024
Project Budget: $17,000,000
Council District(s): 6, 7, 8, 9
NPU(s): Citywide
Project Status / Phase: Active / Construction