Project Name Program Name Category Name Status Start Date End Date Hartsfield Jackson Manifold Improvements Water Distribution System Construction
Procurement02/2018 6/1/2021 Large Meter – Testing, Replacement & Installation Water Distribution System Construction / Procurement 12/14/2015 7/30/2020 Small Diameter Distribution System Rehabilitation & Replacement Water Distribution System Inactive 03/01//15 4/13/2022 Downtown Water Storage Tanks Water Distribution System Planning 10/26/2015 1/1/2019 Distribution System Telemetry Improvements Water Distribution System Inactive 11/2/2015 5/15/2019 Small Meters – Testing, Replacement & Installation Water Distribution System Construction 3/1/2015 6/26/2019 Distribution System Appurtenances Water Distribution System Construction 11/9/2015 4/20/2021 Large Diameter Water System Rehabilitation & Replacement Water Distribution System Planning 11/3/2015 9/9/2020 Water Supply Program - Quarry/Chattahoochee Water Water Supply Construction 3/1/2014 9/1/2020 Hemphill/Chattahoochee WTP - Instrumentation & Controls System Water Water Supply Inactive / Design 3/4/2013 3/16/2018 Hemphill Reservoir #1 Embankment Repairs Water Water Supply Construction 5/4/2015 1/27/2017 Hemphill WTP Compliance Improvements Water Water Facilities Design 5/31/2016 6/20/2018 Chattahoochee WTP Compliance Improvements Water Water Facilities Design 4/4/2016 5/11/2018 Peachtree Creek Trunk Sewer Stabilization Wastewater Wastewater Collection Design Procurement 6/26/2015 8/3/2018 SG3 Contract B Small Diameter Rehabilitation Wastewater Wastewater Collection Construction Procurement 3/1/2015 7/30/2018 SG3 Contract C Small Diameter Rehabilitation Wastewater Wastewater Collection Construction Procurement 1/6/2016 3/6/2019 SG3 Capacity Relief Projects - Ashby-Jett, Lower Proctor Trunk & Terrell Creek Trunk (Phase 2), Niles Avenue Sewer Improvements Wastewater Wastewater Collection Design 10/26/2015 11/7/2019 SG4 Advanced Sewer Capacity Relief - Collier Road Outfall Wastewater Wastewater Collection Design 11/16/2015 8/14/2018 SG3 Contract D Small Diameter Rehabilitation Wastewater Wastewater Collection Inactive 10/18/2016 12/16/2019 SG4 Pipe Rehabilitation Wastewater Wastewater Collection Inactive 10/2/2017 2/11/2021 Nancy Creek Tunnel Shafts Odor Control Wastewater Wastewater Collection Construction 4/25/2014 11/30/2021 Randall Hall Sewer Improvements Wastewater Wastewater Collection Construction 1/2/2013 9/6/2016 Intrenchment Creek Viaduct Rehabilitation Wastewater Wastewater Collection Active / Design 1/1/2017 11/28/2018 Sanitary Sewer Repairs - Annual Contract Wastewater Wastewater Collection Construction 7/1/2015 1/22/2021 Sewer Cleaning & Pipeline Assessment Wastewater Wastewater Collection Active / Planning 11/1/2015 1/14/2026 Raising Valve and Manhole Covers Wastewater Wastewater Collection Inactive 2/24/2016 9/3/2020 Emergency Sewer Repairs Wastewater Wastewater Collection Inactive 11/9/2015 4/20/2021 RM Clayton WRC - Headworks Wastewater Water Reclamation Centers & Facilities Construction 1/27/2014 5/4/2018 Utoy Creek WRC - Aeration Tanks/Slide Gates Wastewater Water Reclamation Centers & Facilities Construction Procurement 12/28/2015 5/22/2017 Utoy Creek WRC - Aeration Tanks/Slide Gates Wastewater Water Reclamation Centers & Facilities Construction Procurement 7/1/2014 12/28/2017 Plant Capital Maintenance - Small Capital Wastewater Water Reclamation Centers & Facilities Construction 11/16/2015 1/30/2017 Intrenchment Creek WRC Decommissioning/South River WRC Primary Clarifiers Replacement Wastewater Water Reclamation Centers & Facilities Construction / Procurement 3/1/2014 1/13/2020 RM Clayton Supplemental Blowers Wastewater Water Reclamation Centers & Facilities Construction 6/13/2015 5/2/2016 South River WRC Various Projects Group 1 Wastewater Water Reclamation Centers & Facilities Inactive 9/1/2014 2/4/2022 Pump Stations Improvement: Phillip Lee, Rebel Forest, Woodward Way 1 and 2, Cascade, Niskey Lake #1, Highlands, SR Industrial, Rivermeade, Bell South, Paul Avenue and Hanover West Wastewater Water Reclamation Centers & Facilities Design 8/28/2013 10/29/2018 Bolton Road Sewage Pump Station Rehabilitation Wastewater Water Reclamation Centers & Facilities Design 1/11/2016 8/18/2020 RM Clayton WRC Sand Filter Refurbishment Wastewater Water Reclamation Centers & Facilities Hold / Design 4/6/2016 8/22/2019 Utoy Creek WRC Improvements - Group 1 Wastewater Water Reclamation Centers & Facilities Inactive 10/26/2015 4/3/2019 RM Clayton Thickener Waste Activated Sludge Centrifuge Wastewater Water Reclamation Centers & Facilities Complete 12/28/2015 8/2/2016 Flint River Sewage Pump Station Replacement Wastewater Water Reclamation Centers & Facilities Active / Design 11/2/2015 9/24/2021 Treatment Plant Facilities - Various projects - Bid Pkg 2 of 6 (Utoy Creek WRC headhouse MCC's and I&C Improvements and Phillip Lee PS bar screens) Wastewater Water Reclamation Centers & Facilities Design 4/15/2014 3/19/2018 RM Clayton Plant Entrance Wastewater Water Reclamation Centers & Facilities Active 10/2/2014 1/29/2016 North Fork Peachtree Creek Tank and Pump Station Wastewater Wastewater System Planning is completed 07/2020 06/2022 RM Clayton Belt Filter Presses Wastewater Water Reclamation Centers & Facilities Complete 1/4/2016 3/1/2017 RM Clayton Emergency Dewatering and Hauling Wastewater Water Reclamation Centers & Facilities Complete 1/19/2016 8/30/2016 South River WRC Filter Refurbishment Wastewater Water Reclamation Centers & Facilities Design 2/8/2016 3/11/2019 RM Clayton WRC - Two Scroll Bowl Kits, Switch Gears, Emergency Generators Wastewater Water Reclamation Centers & Facilities Complete 12/21/2015 11/13/2018 RM Clayton Nutrient Recovery Wastewater Water Reclamation Centers & Facilities Active 9/21/2015 9/8/2017 Custer Avenue Combined Sewer Control Facility – Additional Screens WQCF Water Quality Control Facilities Active / Design / Procurement 10/1/15 1/31/2018 West Area Water Quality Control Facility Improvements WQCF Water Quality Control Facilities Active / Design 1/26/2015 7/28/2018 West Area Water Quality Control Facility - Outfall WQCF Water Quality Control Facilities Design 1/26/2015 1/4/2018 Clear Creek Combined Sewer Control Facility (Package 1, Chemical System Improvements and Flow Monitoring WQCF Water Quality Control Facilities Active / Construction 2/1/2016 7/5/2018 East Area Water Quality Control Facility Improvements WQCF Water Quality Control Facilities Construction 12/8/2015 2/23/2018 Water Quality Control Facilities Improvements Design WQCF Water Quality Control Facilities Design 4/15/2015 3/19/2018 Wet weather Improvements (Combined Sewer System Repair & Rehabilitation) WQCF Water Quality Control Facilities Inactive 12/27/2016 7/28/2021 WRC Energy Management and Improvements WQCF Water Quality Control Facilities Design 1/1/2015 7/31/2017 Clear Creek West Green Infrastructure Watershed Protection Watershed Protection Design 12/21/2015 3/14/2019 Peachtree Creek - South Fork Green Infrastructure - Cheshire Bridge Road Watershed Protection Watershed Protection Design 10/22/2015 5/31/2018 Green Infrastructure Maintenance Watershed Protection Watershed Protection Inactive 11/16/2015 6/17/2021 Southeast Atlanta Green Infrastructure Initiative (SAGII) - Permeable Pavers Watershed Protection Watershed Protection Construction 1/2/2013 10/3/2016 Southeast Atlanta Green Infrastructure Initiative (SAGII) - Capacity Relief Ponds Watershed Protection Watershed Protection Design 7/17/2013 8/27/2018 Clear Creek Water Sewer Improvements - Civic Center Watershed Protection Watershed Protection Planning 11/18/2013 6/30/2018 MOST FUNDED - Storm Water Management Phase I Projects Watershed Protection Watershed Protection Complete 10/31/2016 12/31/2016 MOST FUNDED - Storm Water Management Phase II and III Projects Watershed Protection Watershed Protection Design 6/30/2017 6/30/2018 Upper Proctor Creek- Boone Boulevard Green Infrastructure Watershed Protection Watershed Protection Construction 11/30/2015 12/15/2017 Upper Proctor Creek Water Quality Facility Watershed Protection Watershed Protection Design 2/26/2016 6/12/2019 Upper Proctor Creek Sewer Capacity Relief - Mitchell Street Sewer Watershed Protection Watershed Protection Design 12/12/2014 6/8/2016 Upper Proctor Creek Sewer Capacity Relief - Mims Park Pond Watershed Protection Watershed Protection Design 11/26/2014 11/30/2018 Peyton Center General Facilities Management Design 3/1/2015 5/14/2019 Facility Structural and Site Improvements General Facilities Management Construction 7/1/2015 6/30/2019 Asset Management Implementation & Planning General Support Services Design 6/14/2016 12/14/2017 Asset Management Implementation & Planning (CMMS) - Maximo Consolidation and Warehouse Inventory General Support Services Complete 5/13/2016 8/31/2016 Geotechnical Testing & Investigation General Support Services Services Procurement 1/1/2015 2/16/2021 GDOT/IntraGovernment Agreements Utility Relocation General Support Services Design / Construction 7/1/2015 6/30/2019 Asphaltic Concrete Pavement Milling & Resurfacing General Support Services Inactive 7/8/2013 9/11/2020 Small Business Development Program General Support Services Services Procurement 10/26/2015 5/27/2021 Fleet Replacement General Support Services Services Procurement 7/1/2015 6/30/2019 Program Management General Support Services Procurement 4/6/2015 5/20/16 GIS, aerial photography (general fund cost share) General Support Services Atlanta Wastewater Resiliency Program Atlanta Wastewater Resiliency Program Atlanta Wastewater Resiliency Program TBD -
Active Projects Info
Project Name Program Name Category Name Status Start Date End Date Hartsfield Jackson Manifold Improvements Water Distribution System Construction
Procurement02/2018 6/1/2021 Large Meter – Testing, Replacement & Installation Water Distribution System Construction / Procurement 12/14/2015 7/30/2020 Small Diameter Distribution System Rehabilitation & Replacement Water Distribution System Inactive 03/01//15 4/13/2022 Downtown Water Storage Tanks Water Distribution System Planning 10/26/2015 1/1/2019 Distribution System Telemetry Improvements Water Distribution System Inactive 11/2/2015 5/15/2019 Small Meters – Testing, Replacement & Installation Water Distribution System Construction 3/1/2015 6/26/2019 Distribution System Appurtenances Water Distribution System Construction 11/9/2015 4/20/2021 Large Diameter Water System Rehabilitation & Replacement Water Distribution System Planning 11/3/2015 9/9/2020 Water Supply Program - Quarry/Chattahoochee Water Water Supply Construction 3/1/2014 9/1/2020 Hemphill/Chattahoochee WTP - Instrumentation & Controls System Water Water Supply Inactive / Design 3/4/2013 3/16/2018 Hemphill Reservoir #1 Embankment Repairs Water Water Supply Construction 5/4/2015 1/27/2017 Hemphill WTP Compliance Improvements Water Water Facilities Design 5/31/2016 6/20/2018 Chattahoochee WTP Compliance Improvements Water Water Facilities Design 4/4/2016 5/11/2018 Peachtree Creek Trunk Sewer Stabilization Wastewater Wastewater Collection Design Procurement 6/26/2015 8/3/2018 SG3 Contract B Small Diameter Rehabilitation Wastewater Wastewater Collection Construction Procurement 3/1/2015 7/30/2018 SG3 Contract C Small Diameter Rehabilitation Wastewater Wastewater Collection Construction Procurement 1/6/2016 3/6/2019 SG3 Capacity Relief Projects - Ashby-Jett, Lower Proctor Trunk & Terrell Creek Trunk (Phase 2), Niles Avenue Sewer Improvements Wastewater Wastewater Collection Design 10/26/2015 11/7/2019 SG4 Advanced Sewer Capacity Relief - Collier Road Outfall Wastewater Wastewater Collection Design 11/16/2015 8/14/2018 SG3 Contract D Small Diameter Rehabilitation Wastewater Wastewater Collection Inactive 10/18/2016 12/16/2019 SG4 Pipe Rehabilitation Wastewater Wastewater Collection Inactive 10/2/2017 2/11/2021 Nancy Creek Tunnel Shafts Odor Control Wastewater Wastewater Collection Construction 4/25/2014 11/30/2021 Randall Hall Sewer Improvements Wastewater Wastewater Collection Construction 1/2/2013 9/6/2016 Intrenchment Creek Viaduct Rehabilitation Wastewater Wastewater Collection Active / Design 1/1/2017 11/28/2018 Sanitary Sewer Repairs - Annual Contract Wastewater Wastewater Collection Construction 7/1/2015 1/22/2021 Sewer Cleaning & Pipeline Assessment Wastewater Wastewater Collection Active / Planning 11/1/2015 1/14/2026 Raising Valve and Manhole Covers Wastewater Wastewater Collection Inactive 2/24/2016 9/3/2020 Emergency Sewer Repairs Wastewater Wastewater Collection Inactive 11/9/2015 4/20/2021 RM Clayton WRC - Headworks Wastewater Water Reclamation Centers & Facilities Construction 1/27/2014 5/4/2018 Utoy Creek WRC - Aeration Tanks/Slide Gates Wastewater Water Reclamation Centers & Facilities Construction Procurement 12/28/2015 5/22/2017 Utoy Creek WRC - Aeration Tanks/Slide Gates Wastewater Water Reclamation Centers & Facilities Construction Procurement 7/1/2014 12/28/2017 Plant Capital Maintenance - Small Capital Wastewater Water Reclamation Centers & Facilities Construction 11/16/2015 1/30/2017 Intrenchment Creek WRC Decommissioning/South River WRC Primary Clarifiers Replacement Wastewater Water Reclamation Centers & Facilities Construction / Procurement 3/1/2014 1/13/2020 RM Clayton Supplemental Blowers Wastewater Water Reclamation Centers & Facilities Construction 6/13/2015 5/2/2016 South River WRC Various Projects Group 1 Wastewater Water Reclamation Centers & Facilities Inactive 9/1/2014 2/4/2022 Pump Stations Improvement: Phillip Lee, Rebel Forest, Woodward Way 1 and 2, Cascade, Niskey Lake #1, Highlands, SR Industrial, Rivermeade, Bell South, Paul Avenue and Hanover West Wastewater Water Reclamation Centers & Facilities Design 8/28/2013 10/29/2018 Bolton Road Sewage Pump Station Rehabilitation Wastewater Water Reclamation Centers & Facilities Design 1/11/2016 8/18/2020 RM Clayton WRC Sand Filter Refurbishment Wastewater Water Reclamation Centers & Facilities Hold / Design 4/6/2016 8/22/2019 Utoy Creek WRC Improvements - Group 1 Wastewater Water Reclamation Centers & Facilities Inactive 10/26/2015 4/3/2019 RM Clayton Thickener Waste Activated Sludge Centrifuge Wastewater Water Reclamation Centers & Facilities Complete 12/28/2015 8/2/2016 Flint River Sewage Pump Station Replacement Wastewater Water Reclamation Centers & Facilities Active / Design 11/2/2015 9/24/2021 Treatment Plant Facilities - Various projects - Bid Pkg 2 of 6 (Utoy Creek WRC headhouse MCC's and I&C Improvements and Phillip Lee PS bar screens) Wastewater Water Reclamation Centers & Facilities Design 4/15/2014 3/19/2018 RM Clayton Plant Entrance Wastewater Water Reclamation Centers & Facilities Active 10/2/2014 1/29/2016 North Fork Peachtree Creek Tank and Pump Station Wastewater Wastewater System Planning is completed 07/2020 06/2022 RM Clayton Belt Filter Presses Wastewater Water Reclamation Centers & Facilities Complete 1/4/2016 3/1/2017 RM Clayton Emergency Dewatering and Hauling Wastewater Water Reclamation Centers & Facilities Complete 1/19/2016 8/30/2016 South River WRC Filter Refurbishment Wastewater Water Reclamation Centers & Facilities Design 2/8/2016 3/11/2019 RM Clayton WRC - Two Scroll Bowl Kits, Switch Gears, Emergency Generators Wastewater Water Reclamation Centers & Facilities Complete 12/21/2015 11/13/2018 RM Clayton Nutrient Recovery Wastewater Water Reclamation Centers & Facilities Active 9/21/2015 9/8/2017 Custer Avenue Combined Sewer Control Facility – Additional Screens WQCF Water Quality Control Facilities Active / Design / Procurement 10/1/15 1/31/2018 West Area Water Quality Control Facility Improvements WQCF Water Quality Control Facilities Active / Design 1/26/2015 7/28/2018 West Area Water Quality Control Facility - Outfall WQCF Water Quality Control Facilities Design 1/26/2015 1/4/2018 Clear Creek Combined Sewer Control Facility (Package 1, Chemical System Improvements and Flow Monitoring WQCF Water Quality Control Facilities Active / Construction 2/1/2016 7/5/2018 East Area Water Quality Control Facility Improvements WQCF Water Quality Control Facilities Construction 12/8/2015 2/23/2018 Water Quality Control Facilities Improvements Design WQCF Water Quality Control Facilities Design 4/15/2015 3/19/2018 Wet weather Improvements (Combined Sewer System Repair & Rehabilitation) WQCF Water Quality Control Facilities Inactive 12/27/2016 7/28/2021 WRC Energy Management and Improvements WQCF Water Quality Control Facilities Design 1/1/2015 7/31/2017 Clear Creek West Green Infrastructure Watershed Protection Watershed Protection Design 12/21/2015 3/14/2019 Peachtree Creek - South Fork Green Infrastructure - Cheshire Bridge Road Watershed Protection Watershed Protection Design 10/22/2015 5/31/2018 Green Infrastructure Maintenance Watershed Protection Watershed Protection Inactive 11/16/2015 6/17/2021 Southeast Atlanta Green Infrastructure Initiative (SAGII) - Permeable Pavers Watershed Protection Watershed Protection Construction 1/2/2013 10/3/2016 Southeast Atlanta Green Infrastructure Initiative (SAGII) - Capacity Relief Ponds Watershed Protection Watershed Protection Design 7/17/2013 8/27/2018 Clear Creek Water Sewer Improvements - Civic Center Watershed Protection Watershed Protection Planning 11/18/2013 6/30/2018 MOST FUNDED - Storm Water Management Phase I Projects Watershed Protection Watershed Protection Complete 10/31/2016 12/31/2016 MOST FUNDED - Storm Water Management Phase II and III Projects Watershed Protection Watershed Protection Design 6/30/2017 6/30/2018 Upper Proctor Creek- Boone Boulevard Green Infrastructure Watershed Protection Watershed Protection Construction 11/30/2015 12/15/2017 Upper Proctor Creek Water Quality Facility Watershed Protection Watershed Protection Design 2/26/2016 6/12/2019 Upper Proctor Creek Sewer Capacity Relief - Mitchell Street Sewer Watershed Protection Watershed Protection Design 12/12/2014 6/8/2016 Upper Proctor Creek Sewer Capacity Relief - Mims Park Pond Watershed Protection Watershed Protection Design 11/26/2014 11/30/2018 Peyton Center General Facilities Management Design 3/1/2015 5/14/2019 Facility Structural and Site Improvements General Facilities Management Construction 7/1/2015 6/30/2019 Asset Management Implementation & Planning General Support Services Design 6/14/2016 12/14/2017 Asset Management Implementation & Planning (CMMS) - Maximo Consolidation and Warehouse Inventory General Support Services Complete 5/13/2016 8/31/2016 Geotechnical Testing & Investigation General Support Services Services Procurement 1/1/2015 2/16/2021 GDOT/IntraGovernment Agreements Utility Relocation General Support Services Design / Construction 7/1/2015 6/30/2019 Asphaltic Concrete Pavement Milling & Resurfacing General Support Services Inactive 7/8/2013 9/11/2020 Small Business Development Program General Support Services Services Procurement 10/26/2015 5/27/2021 Fleet Replacement General Support Services Services Procurement 7/1/2015 6/30/2019 Program Management General Support Services Procurement 4/6/2015 5/20/16 GIS, aerial photography (general fund cost share) General Support Services Atlanta Wastewater Resiliency Program Atlanta Wastewater Resiliency Program Atlanta Wastewater Resiliency Program TBD -
Completed Projects
Project Name Program Name Category Name Status Start Date End Date Hartsfield Jackson Manifold Improvements Water Distribution System Construction
Procurement02/2018 6/1/2021 Large Meter – Testing, Replacement & Installation Water Distribution System Construction / Procurement 12/14/2015 7/30/2020 Small Diameter Distribution System Rehabilitation & Replacement Water Distribution System Inactive 03/01//15 4/13/2022 Downtown Water Storage Tanks Water Distribution System Planning 10/26/2015 1/1/2019 Distribution System Telemetry Improvements Water Distribution System Inactive 11/2/2015 5/15/2019 Small Meters – Testing, Replacement & Installation Water Distribution System Construction 3/1/2015 6/26/2019 Distribution System Appurtenances Water Distribution System Construction 11/9/2015 4/20/2021 Large Diameter Water System Rehabilitation & Replacement Water Distribution System Planning 11/3/2015 9/9/2020 Water Supply Program - Quarry/Chattahoochee Water Water Supply Construction 3/1/2014 9/1/2020 Hemphill/Chattahoochee WTP - Instrumentation & Controls System Water Water Supply Inactive / Design 3/4/2013 3/16/2018 Hemphill Reservoir #1 Embankment Repairs Water Water Supply Construction 5/4/2015 1/27/2017 Hemphill WTP Compliance Improvements Water Water Facilities Design 5/31/2016 6/20/2018 Chattahoochee WTP Compliance Improvements Water Water Facilities Design 4/4/2016 5/11/2018 Peachtree Creek Trunk Sewer Stabilization Wastewater Wastewater Collection Design Procurement 6/26/2015 8/3/2018 SG3 Contract B Small Diameter Rehabilitation Wastewater Wastewater Collection Construction Procurement 3/1/2015 7/30/2018 SG3 Contract C Small Diameter Rehabilitation Wastewater Wastewater Collection Construction Procurement 1/6/2016 3/6/2019 SG3 Capacity Relief Projects - Ashby-Jett, Lower Proctor Trunk & Terrell Creek Trunk (Phase 2), Niles Avenue Sewer Improvements Wastewater Wastewater Collection Design 10/26/2015 11/7/2019 SG4 Advanced Sewer Capacity Relief - Collier Road Outfall Wastewater Wastewater Collection Design 11/16/2015 8/14/2018 SG3 Contract D Small Diameter Rehabilitation Wastewater Wastewater Collection Inactive 10/18/2016 12/16/2019 SG4 Pipe Rehabilitation Wastewater Wastewater Collection Inactive 10/2/2017 2/11/2021 Nancy Creek Tunnel Shafts Odor Control Wastewater Wastewater Collection Construction 4/25/2014 11/30/2021 Randall Hall Sewer Improvements Wastewater Wastewater Collection Construction 1/2/2013 9/6/2016 Intrenchment Creek Viaduct Rehabilitation Wastewater Wastewater Collection Active / Design 1/1/2017 11/28/2018 Sanitary Sewer Repairs - Annual Contract Wastewater Wastewater Collection Construction 7/1/2015 1/22/2021 Sewer Cleaning & Pipeline Assessment Wastewater Wastewater Collection Active / Planning 11/1/2015 1/14/2026 Raising Valve and Manhole Covers Wastewater Wastewater Collection Inactive 2/24/2016 9/3/2020 Emergency Sewer Repairs Wastewater Wastewater Collection Inactive 11/9/2015 4/20/2021 RM Clayton WRC - Headworks Wastewater Water Reclamation Centers & Facilities Construction 1/27/2014 5/4/2018 Utoy Creek WRC - Aeration Tanks/Slide Gates Wastewater Water Reclamation Centers & Facilities Construction Procurement 12/28/2015 5/22/2017 Utoy Creek WRC - Aeration Tanks/Slide Gates Wastewater Water Reclamation Centers & Facilities Construction Procurement 7/1/2014 12/28/2017 Plant Capital Maintenance - Small Capital Wastewater Water Reclamation Centers & Facilities Construction 11/16/2015 1/30/2017 Intrenchment Creek WRC Decommissioning/South River WRC Primary Clarifiers Replacement Wastewater Water Reclamation Centers & Facilities Construction / Procurement 3/1/2014 1/13/2020 RM Clayton Supplemental Blowers Wastewater Water Reclamation Centers & Facilities Construction 6/13/2015 5/2/2016 South River WRC Various Projects Group 1 Wastewater Water Reclamation Centers & Facilities Inactive 9/1/2014 2/4/2022 Pump Stations Improvement: Phillip Lee, Rebel Forest, Woodward Way 1 and 2, Cascade, Niskey Lake #1, Highlands, SR Industrial, Rivermeade, Bell South, Paul Avenue and Hanover West Wastewater Water Reclamation Centers & Facilities Design 8/28/2013 10/29/2018 Bolton Road Sewage Pump Station Rehabilitation Wastewater Water Reclamation Centers & Facilities Design 1/11/2016 8/18/2020 RM Clayton WRC Sand Filter Refurbishment Wastewater Water Reclamation Centers & Facilities Hold / Design 4/6/2016 8/22/2019 Utoy Creek WRC Improvements - Group 1 Wastewater Water Reclamation Centers & Facilities Inactive 10/26/2015 4/3/2019 RM Clayton Thickener Waste Activated Sludge Centrifuge Wastewater Water Reclamation Centers & Facilities Complete 12/28/2015 8/2/2016 Flint River Sewage Pump Station Replacement Wastewater Water Reclamation Centers & Facilities Active / Design 11/2/2015 9/24/2021 Treatment Plant Facilities - Various projects - Bid Pkg 2 of 6 (Utoy Creek WRC headhouse MCC's and I&C Improvements and Phillip Lee PS bar screens) Wastewater Water Reclamation Centers & Facilities Design 4/15/2014 3/19/2018 RM Clayton Plant Entrance Wastewater Water Reclamation Centers & Facilities Active 10/2/2014 1/29/2016 North Fork Peachtree Creek Tank and Pump Station Wastewater Wastewater System Planning is completed 07/2020 06/2022 RM Clayton Belt Filter Presses Wastewater Water Reclamation Centers & Facilities Complete 1/4/2016 3/1/2017 RM Clayton Emergency Dewatering and Hauling Wastewater Water Reclamation Centers & Facilities Complete 1/19/2016 8/30/2016 South River WRC Filter Refurbishment Wastewater Water Reclamation Centers & Facilities Design 2/8/2016 3/11/2019 RM Clayton WRC - Two Scroll Bowl Kits, Switch Gears, Emergency Generators Wastewater Water Reclamation Centers & Facilities Complete 12/21/2015 11/13/2018 RM Clayton Nutrient Recovery Wastewater Water Reclamation Centers & Facilities Active 9/21/2015 9/8/2017 Custer Avenue Combined Sewer Control Facility – Additional Screens WQCF Water Quality Control Facilities Active / Design / Procurement 10/1/15 1/31/2018 West Area Water Quality Control Facility Improvements WQCF Water Quality Control Facilities Active / Design 1/26/2015 7/28/2018 West Area Water Quality Control Facility - Outfall WQCF Water Quality Control Facilities Design 1/26/2015 1/4/2018 Clear Creek Combined Sewer Control Facility (Package 1, Chemical System Improvements and Flow Monitoring WQCF Water Quality Control Facilities Active / Construction 2/1/2016 7/5/2018 East Area Water Quality Control Facility Improvements WQCF Water Quality Control Facilities Construction 12/8/2015 2/23/2018 Water Quality Control Facilities Improvements Design WQCF Water Quality Control Facilities Design 4/15/2015 3/19/2018 Wet weather Improvements (Combined Sewer System Repair & Rehabilitation) WQCF Water Quality Control Facilities Inactive 12/27/2016 7/28/2021 WRC Energy Management and Improvements WQCF Water Quality Control Facilities Design 1/1/2015 7/31/2017 Clear Creek West Green Infrastructure Watershed Protection Watershed Protection Design 12/21/2015 3/14/2019 Peachtree Creek - South Fork Green Infrastructure - Cheshire Bridge Road Watershed Protection Watershed Protection Design 10/22/2015 5/31/2018 Green Infrastructure Maintenance Watershed Protection Watershed Protection Inactive 11/16/2015 6/17/2021 Southeast Atlanta Green Infrastructure Initiative (SAGII) - Permeable Pavers Watershed Protection Watershed Protection Construction 1/2/2013 10/3/2016 Southeast Atlanta Green Infrastructure Initiative (SAGII) - Capacity Relief Ponds Watershed Protection Watershed Protection Design 7/17/2013 8/27/2018 Clear Creek Water Sewer Improvements - Civic Center Watershed Protection Watershed Protection Planning 11/18/2013 6/30/2018 MOST FUNDED - Storm Water Management Phase I Projects Watershed Protection Watershed Protection Complete 10/31/2016 12/31/2016 MOST FUNDED - Storm Water Management Phase II and III Projects Watershed Protection Watershed Protection Design 6/30/2017 6/30/2018 Upper Proctor Creek- Boone Boulevard Green Infrastructure Watershed Protection Watershed Protection Construction 11/30/2015 12/15/2017 Upper Proctor Creek Water Quality Facility Watershed Protection Watershed Protection Design 2/26/2016 6/12/2019 Upper Proctor Creek Sewer Capacity Relief - Mitchell Street Sewer Watershed Protection Watershed Protection Design 12/12/2014 6/8/2016 Upper Proctor Creek Sewer Capacity Relief - Mims Park Pond Watershed Protection Watershed Protection Design 11/26/2014 11/30/2018 Peyton Center General Facilities Management Design 3/1/2015 5/14/2019 Facility Structural and Site Improvements General Facilities Management Construction 7/1/2015 6/30/2019 Asset Management Implementation & Planning General Support Services Design 6/14/2016 12/14/2017 Asset Management Implementation & Planning (CMMS) - Maximo Consolidation and Warehouse Inventory General Support Services Complete 5/13/2016 8/31/2016 Geotechnical Testing & Investigation General Support Services Services Procurement 1/1/2015 2/16/2021 GDOT/IntraGovernment Agreements Utility Relocation General Support Services Design / Construction 7/1/2015 6/30/2019 Asphaltic Concrete Pavement Milling & Resurfacing General Support Services Inactive 7/8/2013 9/11/2020 Small Business Development Program General Support Services Services Procurement 10/26/2015 5/27/2021 Fleet Replacement General Support Services Services Procurement 7/1/2015 6/30/2019 Program Management General Support Services Procurement 4/6/2015 5/20/16 GIS, aerial photography (general fund cost share) General Support Services Atlanta Wastewater Resiliency Program Atlanta Wastewater Resiliency Program Atlanta Wastewater Resiliency Program TBD