HomeWWS-SG3 Contract D Small Diameter Rehabilitation
Wastewater System
Project Name: SG3 Contract D Small Diameter Rehabilitation
The Department is continuing the implementation of the Sewer Rehabilitation Program to upgrade its existing small diameter sewers to reduce the amount of extraneous flows, infiltration and inflow (I/I) entering the system, in addition to eliminating sanitary sewer overflows and capacity limitations. To accomplish this objective, the City proposes system improvements for small diameter sewers situated in the Sugar Creek Sewer Basin and located in approximately 10 sewer heads.
This project is necessary to meet the requirements of the Second Amended Consent Decree (SACD), which prescribes evaluation and improvement measures to eliminate sanitary sewer overflows (SSOs) and to protect the City’s investment in upgraded water reclamation facilities. Structural upgrades to the system are necessary to replace old and deteriorated sewers in order ensure the extended service life, reliability, and improve flow conveyance. The current milestone completion date for the work under this project is July 1, 2020.
The scope of the project includes:
Pre-cleaning of sewers
Lining of sewers using Cured-in-Place pipe (CIPP)liner
Replacing sewers through pipe bursting
Installing new sewer using horizontal directional drilling methods
Replacing sewers using open-cut methods
Addressing defects in short pipe sections through Internal and external point repairs
Rehabilitating manholes
Justification:
Addresses Consent Decree requirements
Enhances flow capacity of small diameter sewers
Reduces inflow and infiltration or extraneous flows into the sewer system
Increases protection of our receiving waters and reduced threat to public health and safety
Project Type: Consent Decree Proposed Project Start: 07/24/2017 Proposed Construction Start: 11/2018 Scheduled Completion: 06/30/2020 Project Budget: $22,438,000 Council District(s): 5 NPU(s): Citywide Project Status / Phase: Complete / Construction