Project Name: Sanitary Sewer Repairs – Annual Contract
Project Includes:
- Sanitary Sewer Repair Annual Contract A
- Sanitary Sewer Repair Annual Contract B
- Sanitary Sewer Repair Annual Contract C
The intent of this annual contract is to serve as an undefined scope contracting mechanism to complete necessary linear sanitary sewer repairs on an as-needed basis to supplement and support DWM Linear Operations.
The project will facilitate the long-term sustainability and structural integrity of a critical linear asset, ensuring continued operation as intended and mitigating environmental risks. The project will allow for adequate conveyance capacity for existing and new Customers, and lead to improved treatment capacity at the area Water Reclamation Center.
The scope of this project includes:
Repairing linear sewer assets utilizing methods such as:
- Cured-in-Place Pipe (CIPP)
- Pipe-bursting
- Internal and external point repairs
- Open-cut replacement
- Jack and bore installations
Justification:
- Reduces Infiltration/Inflow or extraneous flows into the sewer system
- Contributes to reductions in Sanitary Sewer Overflows
- Increases protection of receiving waters and reduces threat to public health and safety
- Enhances responsiveness to complete emergency repairs
Project Type: Consent Decree
Project Start: 05/18/2016
Proposed Construction Start: Varies and Annual Renewals
Project End: 9/16/2021
Project Budget: $41,600,000
Council District(s): Citywide
NPU(s): Citywide
Project Status / Phase: Complete / Construction