Project Name: East Area Water Quality Control Facility Improvements
Combined sewer flow from the Custer Avenue Combined Sewer Control Facility (CSCF) is transported through the East Area Tunnel, formerly known as the Intrenchment Creek Storage Tunnel, for treatment at East Area Water Quality Control Facility (WQCF). The capacity of the East Area WQCF is 20 MGD but can treat flows up to 34 MGD. The East Area WQCF needs upgrades and repairs to restore efficiency and reliability. The solid thickening and dewatering and vortex grit removal units require rehabilitation. In addition, the facility has significant corrosion and the filter building and residual handing units need replacement.
The scope of this project includes:
Rehabilitating the sludge thickening and dewatering facilities
Repairing the tunnel pump station outfall
Repairing the East Area WQCF sedimentation basin
Providing electrical improvements
Replacing six sedimentation basin submersible sludge pumps
Upgrading chemical system equipment
Rehabilitating the East Area WQCF solids processing pump station
Providing an update to the Foxboro control system software
Justification:
Improves system reliability helps the City meet new permit requirements
Provides safer working conditions for operating personnel
Reduces imminent, short term, and long-term compliance risks
Project Type: CSO Facilities Project Start: 02/28/2013 Proposed Construction Start: 04/2022 Scheduled Completion: 1/28/2024 Project Budget: $9,219,000 Council District(s): 1, 12 NPU(s): Y, Z Project Status / Phase: Active / Construction