Project Name: Treatment Plant Facilities – Various Projects
Includes project:
Utoy Creek WRC Instrumentation/Control Reliability Restoration
The Primary Headhouse electrical and instrumentation systems at the Utoy Creek Water Reclamation Center (WRC) monitor and control the process equipment to treat wastewater. It has been determined that the equipment is outdated and no longer supported by the manufacturer. The goal of this project is to reduce the risk of failure due to a sewage spill or a safety hazard by replacing the equipment and providing the level of redundancy required to ensure that Utoy Creek WRC maintains its regulatory compliance.
The scope of this project includes:
Replacing and upgrading electrical switchgear and power distribution equipment
Replacing telemetry and process control system components
Replacing Series 100 modules in primary
Replacing input/output (I/O) panels
Installing additional workstations in the administrative conference room & ultraviolet (UV) building control room
Installing additional fibers
Justification:
Replaces outdated and obsolete electrical and instrumentation and controls
Reduces the risk of failure due to a sewage spill or a safety hazard
Project Type: Water Reclamation Centers and Facilities Project Start: 4/1/2014 Proposed Construction Start: N/A Scheduled Completion: 03/9/2018 Project Budget: $5,890,000 Council District(s): 1,2,8,9 NPU(s): A, C, D, G, I M, P, Z Project Status / Phase: Complete / Design